Engineering
Multi-Level Bill of Materials
- Define nested component assemblies and packaging.
- Auto-check raw material availability before job start.
- Factor in raw material scrap allowance tolerances.
BOM Recipe Grid
1. Finished Metal Table:
- Iron Frame (1.2m)
- Wooden Top Board (1 unit)
Finance
Finished Unit Cost Roll-Up
- Track material, labor hours, and overhead cost.
- Auto-generate double-entry WIP/Finished journals.
- Identify workstation yield and reject ratios.
Job Cost Summary
Active WIP
Materials CostSAR 1,200.00
Labor (3 Hours)SAR 150.00
Start Your Free Evaluation
Ready to Digitize Your Factory Production with JAKA Cloud?
Join growing discrete manufacturers and assembly workshops across Saudi Arabia and the GCC.